China Harbour Engineering Company Limited is currently seeking a reliable supplier for the rental of construction machinery to support ongoing project activities. We kindly request your company to provide a quotation based on the following preliminary requirements:
1. Rental Equipment and Technical Requirements
1) Truck Crane (25t)
- Quantity: 1 unit
- Rental Period: 80 shifts
- Normal Working Hours: Not less than 8 hours/shift
- Operator: Included
- Fuel: Provided by the Lessor
2) Truck Crane (50t)
- Quantity: 1 unit
- Rental Period: 150 shifts
- Normal Working Hours: Not less than 8 hours/shift
- Operator: Included
- Fuel: Provided by the Lessor
3) Truck Crane (80t)
- Quantity: 1 unit
- Rental Period: 60 shifts
- Normal Working Hours: Not less than 8 hours/shift
- Operator: Included
- Fuel: Provided by the Lessor
4) Flatbed Trailer Set (40t)
- Quantity: 1 unit
- Rental Period: 180 shifts
- Normal Working Hours: Not less than 8 hours/shift
- Operator: Included
- Fuel: Provided by the Lessor
5) Long-arm Excavator (Boom Length ≥ 20m)
- Quantity: 1 unit
- Rental Period: 30 shifts
- Normal Working Hours: Not less than 8 hours/shift
- Operator: Included
- Fuel: Provided by the Lessor
2.Payment Terms
(1) Progress payment: The rental fee for each month shall be confirmed by both parties on the 25th of each month and paid within 30 days after confirmation.
(2) Performance bond: 10% of the contract amount.
3. Other Requirements
- The quotation shall remain valid for not less than 30 calendar days from the date of submission.
- The rental unit price shall include mobilization and demobilization costs.
- Routine maintenance and repairs during the rental period shall be the responsibility of the supplier.
- All equipment must possess valid documentation and comply with applicable local regulations.
- All machinery must possess the required permits and documentation for entering and operating within the Old Port of Tema, Ghana.
- The quotation shall clearly indicate rental unit price per shift, mobilization/demobilization fees (if any), and total amount (excluding tax).
4. Quotation List
| No. |
Equipment Description |
Quantity (Unit) |
Rental Period (Shifts) |
Unit Price (Excl. Tax) (USD/Shift/Unit) |
Total Amount (Excl. VAT,USD) |
Remarks |
| 1 |
Truck Crane (25t) |
80 |
1 |
|||
| 2 |
Truck Crane (50t) |
150 |
1 |
|||
| 3 |
Truck Crane (80t) |
60 |
1 |
|||
| 4 |
Flatbed Trailer Set (40t) |
180 |
1 |
|||
| 5 |
Long-arm Excavator (≥20m) |
30 |
1 |
|||
| Total |
Total Rental Fee:__________ |
|||||
We kindly request your company to send the formal quotation to the following email address at your earliest convenience: dredgingoftheportoftema@gmail.com.
Should you require any further clarification or information, please do not hesitate to contact us. We look forward to receiving your quotation and appreciate your attention to this matter.
Yours sincerely,
China Harbour Engineering Company Limited
本公告详情仅供VIP会员或SVIP会员查阅,您当前权限无法查看完整内容,请先 登录 或 注册 ,办理会员入网事宜后按照后续流程参与投标!
联系人:张晟
手 机:13621182864
邮 箱:zhangsheng@zgdlyzc.com